1
/
of
1
Mapmaker - Critical Path (Vinyl) | Mint (M) Mint (M)
Mapmaker - Critical Path (Vinyl) | Mint (M) Mint (M)
Regular price
$ 16.90 USD
Regular price
$ 16.90 USD
Sale price
$ 16.90 USD
Shipping calculated at checkout.
Couldn't load pickup availability
Description
Description
Critical Path (Vinyl) is a Records & LPs from Mapmaker
- Sleeve Condition: Mint (M)
- Media Condition: Mint (M)
- Format Detail: LP w/ DL
- Label: Salinas Records
- Catalog Number: LP-SAL-054
Condition Ratings & Details
Condition Ratings & Details
NOTE: Every title includes condition ratings. The first rating pertains to the physical media, and the second grade pertains to the sleeve.
NOTE: Images may not be exact. Please refer to the description to determine whether the images are Actual Photos or Photos Not Actual. New records will likely use generic web photos to represent the product.
Condition Ratings
- MINT (M): Perfect, brand new, unplayed.
- Near Mint (NM): Like new, barely played, will play perfectly.
- Excellent (EX): Very close to near mint, with minor cosmetic wear. Will play perfectly.
- Very Good Plus (VG+): Light cosmetic blemishes that do not affect play. Close to perfect playback.
- Very Good (VG): Some light marks that may cause minor noise during playback. Still enjoyable and plays well.
- Good Plus (G+): Noticeable noise during playback. Only listed if of collector value. Not ideal for listening.
Sleeve Details
- PHOTOS ACTUAL: The photo is an original image of the exact item you will receive.
- PHOTOS NOT ACTUAL: The photo is sourced from the web and may differ slightly from the actual item.
